Nexans Norway was selected in July 2022 as he preferred bidder for the award of the contracts for the engineering, procurement, construction and installation of the two HVDC cable systems for the first phase of the interconnector. In January 2022, EU countries agreed to invest €657m in the project under the Connecting Europe Facility (CEF). The interconnector secured a €100m grant from the European Commission in July 2021. Its total offshore length is 1208 km (310 km Cyprus to Israel, 898 km Cyprus to Crete), while its onshore length is 25 km. At full deployment, the 500 kV interconnector will allow the transfer of 2,000 MW. In addition, to be part of the EuroAsia Interconnector project, which aims to connect Israel, Cyprus and Greece with 2000 MW HVDC undersea power cable. The project, listed under the fifth EU list of Projects of Common Interest (PCI), is a multi-terminal high-voltage, direct current scheme which will connect the transmission networks of Greece, Cyprus and Israel, and will comprise three converter stations with sea-electrodes, interconnected by cables. As a second phase, once the Cyprus to Crete project is completed, an electricity link between Cyprus and Israel will be constructed. Commissioning is scheduled by the end of 2026. Cyprus is the last non-interconnected EU member state. Support for the so-called East Med pipeline project has waned amid questions over its feasibility as well as its adverse impact on the environment.Ĭypriot President Nicos Anastasiades said last week that studies on the pipeline’s feasibility were still ongoing, but other alternatives are open to get gas to markets.Īmong the more likely options is to convey Cypriot gas to Egyptian processing plants where it would be liquefied for export by ship.Greece and Cyprus have started building the first phase of the EuroAsia interconnector, which will consist of a 1,000 MW undersea cable connecting the electricity grids of the two countries via Crete. The move toward an electricity cable link appears to have supplanted plans for a potential pipeline connection between the three countries to convey gas from existing and potential deposits off Cyprus and Egypt to Europe through Greece. The cable’s first phase is expected to be completed by 2025. ![]() The agreement aimed to expedite permits and approvals for feasibility studies and to help the three countries’ national electricity coordinators to cooperate on how best to move forward. Pilides and her Greek and Israeli counterparts signed an agreement last October to speed up technical work on the cable dubbed the “Eurasia Interconnector.” Pilides said a study shows that the cable in combination with power storage facilities could push Cyprus’ use of renewable energy sources above 50 percent by 2030. With the cable’s completion, it’s expected that more investment will flow into renewable energy sources enhancing the energy mix of Greece, Cyprus and Israel. Pilides said beyond the project’s geopolitical weight, it will ensure Cyprus’ energy security, boost competitiveness in the power supply sector and help the island nation more easily transition to a green economy. ![]() ![]() Negotiations to transfer the funds are expected to wrap up this summer. The 9 billion Euro-Asia Interconnector will be the world’s longest and deepest underwater power cable, according to Israel’s Energy Ministry.The post Israel, Cyprus, Greece to link power. JERUSALEM, March 8 (Reuters) - Cyprus, Greece and Israel on Monday signed an initial agreement to build the world's longest and deepest underwater power cable that will traverse the. Pilides said the money enables crews to start constructing the segment of the cable that will connect Cyprus with Crete whose total cost is estimated at roughly 1.6 billion euros ($1.8 billion). Pilides told reporters the funding is Cyprus’ largest-ever investment as well as the lion’s share of the total sum that the EU’s Connecting Europe Facility, which bankrolls infrastructure projects, has allocated to a single project this year. NICOSIA, Cyprus-The European Union has earmarked 657 million euros ($736 million) for the construction of a 2,000-megawatt undersea electricity cable that will link the power grids of Israel, Cyprus and Greece, Cypriot Energy Minister Natasa Pilides said Thursday.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |